Free EPS Site Evaluation

Free EPS Foam Recycling Site Evaluation

Choosing the right EPS ( expanded polystyrene) foam densifier starts with understanding the actual conditions at your facility. StyroSolutions provides a free EPS site evaluation to assess your EPS volume, material flow, and site readiness before making any equipment recommendations.

This evaluation helps manufacturers, warehouses, distribution centers, and institutional facilities determine the appropriate densifier model, confirm buy-back eligibility, and avoid installation delays caused by electrical or space constraints. In most cases, the assessment takes about 20 minutes and results in a written report with clear operational data specific to your facility.

With 25 years of environmental experience supplying and commissioning EPS foam densifiers across the United States, StyroSolutions conducts every evaluation directly through the owner or a dedicated sales specialist, ensuring accurate recommendations and a clear path to implementation.

Call (877) 682-4081 or request your evaluation online to schedule within 1 to 2 weeks.

What We Assess During EPS Foam Densifier Site Evaluation

During the evaluation, we assess your facility conditions to determine which densifier machine fits your operation and whether your EPS stream qualifies for buy-back.

  • Electrical Supply: We verify your available voltage and confirm whether 460V three-phase power is accessible in your proposed placement area.

  • Floor Space and Placement: We evaluate your floor type, forklift access, and proximity to your EPS foam waste generation point to identify the optimal placement for the densifier machine.

  • Venting: We confirm your facility layout safely supports the thermal densifier’s exhaust requirements at the proposed installation area.

  • Ceiling Clearance: We measure ceiling height at the placement area to confirm which XT-Series models are compatible with your space.

  • EPS Volume and Material Workflow: We review how EPS enters your facility, where it accumulates, and how it currently moves through your operation. Volume, estimated in pounds per day or week, is the primary factor in model selection and buy-back eligibility.

  • Staging Space for Densified Material: We assess the available staging area to determine if your facility can hold a full load of densified EPS blocks before shipping to recycling centers.

What You Will Receive After the Evaluation

We deliver a full written report after the assessment is complete. All figures are based on your real site conditions, not industry averages.
Projected EPS Foam Waste Hauling Savings

We calculate your facility’s current EPS hauling and disposal costs, then project what those costs will be after densification. The calculation uses your actual EPS volume and current hauling frequency.

Buy-Back Revenue Estimate
If your EPS stream qualifies for our buy-back program, we include a projected figure for the buy-back payments your densified EPS blocks will generate. Buy-back pricing depends on EPS grade, cleanliness, compaction level, and volume consistency. We determine whether your operation can meet those standards and at what price point.
Densifier Placement Drawing

We include a drawing showing where the recommended XT-Series densifier machine would sit in your facility, based on your floor layout, EPS workflow, electrical supply location, and staging space.

Model Recommendation

We identify the XT-Series model that best fits your operation based on your EPS volume, site conditions, and available power supply. Selection accounts for processing capacity, ceiling clearance, and floor space.

Formal Written Proposal

We accompany the report with a formal proposal. It is important to note that there is no obligation to proceed.

Buy-Back Eligibility Assessment

Two common questions in almost every evaluation are: which machine is the right fit, and whether your processed material can generate revenue. We address both questions during a single visit.

How We Determine If Your Densified EPS Blocks Are Eligible for Buy-Back

At StyroSolutions, we purchase densified EPS through our buy-back program when material meets four criteria: EPS grade, cleanliness, compaction level, and volume consistency. We assess whether your EPS stream can meet those standards. Our evaluator reviews how foam enters your facility, how it is handled on site, and whether it can be kept separate from other waste streams.

Not Every Facility Qualifies Right Away

Not every facility qualifies at the time of the evaluation. In some cases, small adjustments to collection or staging can make you eligible for buy-back. When that happens, we outline the specific handling adjustments needed in your written report.

What We Review for Buy-Back

During the buy-back assessment, we cover:

  • The type of EPS your facility generates (packaging foam, insulation offcuts, production scrap)

  • Whether the material can be kept clean, dry, and separated from mixed waste

  • Your estimated EPS volume per week or month

  • Your facility’s capacity to stage densified EPS foam blocks until a full load is ready for shipment

When EPS Foam Volume Is Uncertain

EPS volume is the primary variable in buy-back pricing. For facilities where volume is difficult to estimate before the evaluation, we screen it over the phone first. If the preliminary conversation confirms you are running a high-volume operation, we schedule the evaluation by phone or on-site, depending on the assessment’s requirements. We deliver the full buy-back revenue estimate after the assessment is complete, not before.

How the Free EPS Site
Evaluation Works

From first contact to written proposal, the process takes 1-2 weeks. We start the process with a phone call and, when site conditions require a visit, we conduct a 20-minute on-site assessment.

1. Initial Phone Call

To get started, contact us by phone or through our contact form. We confirm your EPS volume, foam type, and current disposal situation. For facilities where the EPS stream can be assessed remotely, we complete the full evaluation by phone.

2. Schedule On-Site Visit

If we need to assess your electrical supply, placement, venting, or workflow in person, we schedule the visit within 1-2 weeks of your initial call.

3. On-Site Assessment

We review your site conditions, EPS volume, and material workflow. We assess buy-back eligibility during the same assessment.

4. Written Report and Proposal

We will provide you with a written report and formal proposal after the assessment. There is no obligation to proceed.

our clients

Who Conducts the EPS Site Assessment

Every evaluation is conducted by a direct sales specialist. We do not use subcontractors for site assessments. That means your evaluator has direct knowledge of the XT-Series densifier line, our buy-back program pricing criteria, and the site conditions that determine whether a given model will work in your facility. That experience spans manufacturing plants, distribution centers, warehouses, and institutional facilities, covering the full range of EPS streams, electrical configurations, and space constraints encountered in real operations.

Our experience matters for two reasons. First, your model recommendation reflects what our evaluator observes at your facility, not a standard configuration. Second, your buy-back eligibility is assessed by someone who knows exactly what our program requires and can tell you plainly whether your stream qualifies and what, if anything, needs to change. For facilities where a phone assessment is sufficient, the same level of knowledge applies.

Frequently Asked Questions

We review your site conditions, including electrical supply, floor type and placement, venting, and ceiling clearance, as well as EPS volume, workflow, and staging space. We also assess output quality and buy-back eligibility during the same visit. On average, the full assessment takes about 20 minutes.

An EPS site evaluation takes approximately 20 minutes. Phone-based evaluations vary depending on complexity but are typically completed in a single call.

Yes. There is no charge and no obligation to purchase. The written report, placement drawing, and formal proposal are all part of the evaluation. We offer the assessment to determine whether a densifier installation makes financial sense for your facility.

You receive a written report covering projected EPS foam waste hauling savings, estimated buy-back revenue, a densifier placement drawing, and an XT-Series model recommendation. A formal proposal is also included. The report uses data gathered during your assessment, not generic industry figures.

We ask about your estimated volume during the initial phone call, before scheduling a visit. If your estimated volume is sufficient to make densification financially viable, we schedule the evaluation. We screen low- or uncertain-volume cases over the phone first.

Yes. For facilities where EPS volume, foam type, and handling conditions can be assessed remotely, we complete the full evaluation by phone. We schedule a site visit when physical conditions, such as electrical supply, ceiling clearance, or placement, require an in-person assessment.

Request Your Free EPS Site Evaluation

The evaluation is free and carries no purchase obligation. We schedule eps foam densifier site evaluations within 1-2 weeks of your initial call.

What to have ready when you call:

  • Your estimated EPS volume per week or month

  • The type of foam your facility generates (packaging foam, insulation offcuts, production scrap)

  • Photos of your EPS storage area, if available

If your volume and foam type confirm a fit, we can schedule the evaluation right away.